ROUTINE TESTS AND CONTROLS
Measurement of Winding Resistances
Conversion Ratio and Vector Group Control Measurement
of Impedance Voltage (in the main stage) Uk and Load Loss Pb
Idle Loss Po and Idle Current lo Measurement Applied
Voltage Test (60 sec. at Full Voltage)
Induced Voltage Test (60 sec. at 2 Times Voltage at Increased Frequency)
All readings are stored for continuous statistical analysis.
TYPE TESTS
(Optional Tests)
Hot Rise Test (With Short Circuit Method in Rated Current)
Impulse Voltage Test (1.2/50 us Pulse at Negative Polo to Each Terminal)
SPECIAL TESTS
Noise Level Test
Zero Component Impedance Measurement
Proving Thermal and Dynamic Short Circuit Endurance